+86-18795881025
yihui.zhao@airflercn.com

‌Safety Measures During Blowdown Operations

Release Time:2025.04.12 Browse:10

III. Emergency & Post-Operation Measures

  1. Emergency Preparedness

    • Develop and rehearse emergency plans. Equip the site with explosion-proof tools, fire extinguishers, and first-aid kits to respond swiftly to leaks or fires.

    • Test gas concentration in the air receiver before blowdown to prevent accumulation of flammable or toxic gases .

  2. Post-Operation Verification

    • After closing the blowdown valve, check for leaks manually or with instruments to ensure sealing integrity .

    • Gradually repressurize the system while continuously monitoring pressure gauge stability to confirm no abnormal fluctuations .


扫码添加客服微信
+86-18795881025