+86-18795881025
yihui.zhao@airflercn.com

‌Safety Measures During Blowdown Operations

Release Time:2025.04.12 Browse:10

IV. Long-Term Safety Management

  • Routine Maintenance‌: Inspect blowdown valves and pipelines for blockages during each shift. Clean rust or debris regularly.

  • Documentation & Training‌: Record blowdown times, operators, and anomalies. Conduct regular safety training and emergency drills.

  • Environmental Adaptation‌: Increase blowdown frequency to every 8 hours during high temperatures, rainy seasons, or heavy usage to reduce corrosion risks .


Outcome

These measures effectively prevent personnel injuries, equipment damage, and environmental pollution, ensuring the safe and stable operation of air receivers .

Let me know if you need further adjustments!


扫码添加客服微信
+86-18795881025