‌Detailed Steps for Air Receiver Blowdown Operation

Release Time:2025.04.12 Browse:10

III. Post-Drainage Inspection & Documentation

  1. System Validation

    • Inspect welds, joints, and safety valves for integrity .

    • Test safety valve sensitivity: Close the outlet valve, adjust pressure to 0.85 MPa, and verify that the safety valve activates at 0.80 MPa .

  2. Maintenance Records

    • Document drainage time, operator name, waste status, and anomalies.

    • Regularly clean drainage pipes to prevent rust or debris from clogging valves.


Key Precautions

  • Safety Gear‌: Wear gloves and goggles throughout the process. Avoid contact with high-temperature or high-pressure components .

  • Automated Drainage‌: For solenoid or mechanical valves, regularly test valve functionality and pipe cleanliness .

  • Environmental Adaptation‌: Increase drainage frequency to every 8 hours during high temperatures, rainy seasons, or heavy usage .


Benefits of Compliance

Proper operation extends the air receiver’s lifespan and prevents system corrosion or failures caused by moisture or contaminants.