I. Pre-Drainage Preparation
Safety Verification
Operators must receive professional training and understand the structure and principles of the air receiver .
Inspect the air receiver and surrounding environment for leaks, corrosion, or hazards .
Prepare drainage tools (e.g., drain pipes, valve wrenches) and emergency equipment (e.g., explosion-proof containers) .
System Adjustment
Close the air intake valve to stop compressed air supply .
Monitor the pressure gauge to ensure stable internal pressure with no fluctuations .