‌Detailed Steps for Air Receiver Blowdown Operation

Release Time:2025.04.12 Browse:10

I. Pre-Drainage Preparation

  1. Safety Verification

    • Operators must receive professional training and understand the structure and principles of the air receiver .

    • Inspect the air receiver and surrounding environment for leaks, corrosion, or hazards .

    • Prepare drainage tools (e.g., drain pipes, valve wrenches) and emergency equipment (e.g., explosion-proof containers) .

  2. System Adjustment

    • Close the air intake valve to stop compressed air supply .

    • Monitor the pressure gauge to ensure stable internal pressure with no fluctuations .