FAQ : Installation & Operation

Release Time:2025.03.31 Browse:9

Q:What are the environmental requirements for installation?
A:

  • Maintain 1.5m clearance around the unit for ventilation.

  • Ambient temperature: 5°C–40°C (air-cooled models) or -10°C–45°C (water-cooled models).

  • Avoid welding/sparks within 5m of the tank.

Q: What’s the correct startup/shutdown procedure?
A:
Startup:

  1. Ensure the tank pressure gauge reads 0 psi.

  2. Power on and let it idle for 3 mins to warm up.

  3. Gradually increase load to rated pressure (175 psi).

Shutdown:

  1. Release all air via the drain valve.

  2. Turn off the power.

  3. Drain condensate from the tank and dryer (critical in sub-zero conditions).